The purpose of this project is to build a gas pressure boosting station with a capacity of 70 million cubic meters per day and includes:
- Design, purchase, installation and execution of all civil, structural, mechanical, plumbing, electrical and precision instruments departments.
- Supplying and installing mechanical and process equipment including scrubber, air cooler, air compressor package
- Installation of 4 gas turbo compressors
- Preparation and implementation of piping for all industrial (process) and utility parts in the amount of 55000 inches in diameter.
- Supplying and installing medium and low pressure panels, transformers, earthing systems and lightning arresters, electrical cabling and others
- Installation of fire alarm system, control system, ESD, instruments and other complementary activities of instruments
- Construction of buildings for control room, guarding and required canopies (turbo compressor, air package, etc.)
- Excavation operations, embankment, equipment foundation, landscaping, fencing and other civil operations