Design, procurement, construction, transportation and installation of cathodic protection system equipment for the second water supply line from Minab to Bandar Abbas with a length of 100 kilometers, including:
- All earthworks and civil operations, concrete and molding works, painting and metal works
- Supply and installation of rectifier transformer, injection current anodes, isolated parts, anode wellhead equipment, rectifier converters
- Conducting all copper cabling and grounding and test point equipment and setting up and testing the cathodic protection system.