This project aims to build two fuel tanks each with a capacity of about 20,000 cubic meters and ancillary equipment including:
- Implementing a fuel unloading station (increasing capacity)
- Construction operations including (excavation, implementation of concrete ring, implementation of concrete bandwall wall, implementation of access roads, construction of trenches and surface water collection channels)
- Tank bed consolidation operation
- Purchase, construction and installation of two storage tanks, each with a capacity of 20,000 cubic meters, weighing approximately 1,000 tons.
- Preparation of boiler and piping package related to the capacity of 14 tons per hour and implementation of fuel heating system and steam and condensate pipes.
- Complete purchase and implementation of carbon steel and polyethylene fire fighting system piping for about 12 kilometers in different sizes.
- Preparation, installation and implementation of electrical and control system including earth system, lighting, main and sub panels, control system and precision instruments.