Implementation of the main building with 64 beds, side buildings with an area of approximately 9000 square meters with a skeleton of reinforced concrete and block beam roofs, stone facade, false ceilings of Dampa and Rabbits, landscaping and construction of canals, canals, street construction, garden and the surrounding wall
Implementation of electrical and mechanical installations of the project included:
- Hot and cold water pipes, heating and ventilation, steam
- Electrical steel pipes
- Medical gases (V - O2- N2O)
- Cable trays, electrical and control and telephone cables, fire alarm, fire extinguishing, intercom, nurse call and audio systems.
- Ductwork related to ventilation, supply and installation of ventilation devices, air washers
- Steam and hot water boilers, related electric pumps, as well as two chillers, cooling towers
- Water supply and fire station
Electric substation and passage, diesel generators and transformers etc.