Shahrekord Ayatollah Kashani Hospital

Shahrekord Ayatollah Kashani Hospital

Development Percentage
0

%

Shahrekord Ayatollah Kashani Hospital
Client
Shahrekord University of Medical Sciences
Consultant
Maher and Colleagues consulting engineers
Status
Completed
Contract Period
90 Months
Commencement Date
March ,2006

Construction of a new 320-bed building with a concrete frame in one nine-story block, two eight-story blocks, and one three-story block and in 22,500 square meters of infrastructure including: (14 general operating rooms, ear, nose and throat, 11 beds for C.C.U, I.C.U. , inpatient, emergency, laboratory, radiology, CT scan, burn, eye, etc. departments.
- Excavation, earthing and crushing operations
- Molding and reinforcement
- Concrete pouring and concrete skeleton execution
- Brickwork, insulate, installation of door and window frames, carpentry
- Complete implementation of electrical and mechanical installations
- Purchase of engine room equipment, ventilators, air washers, medical gas and vacuum systems, garbage incinerators, elevators, installation and commissioning of all systems.
- Creating an electricity supply network from municipal electricity, diesel generators and UPS
- Creating false ceilings from fixed Kenaf, Armstrong and Dampa