Ardabil 220-bed educational hospital

Ardabil 220-bed educational hospital

Development Percentage
0

%

Ardabil 220-bed educational hospital
Client
Ministry of Roads and Urban Development (executive organization of government and public buildings and establishments)
Consultant
Shora Consulting Engineers
Status
Completed
Contract Period
24 Month
Commencement Date
March 14, 2001

The Ardabil Teaching Hospital project is expected to have 200 beds and support, educational and side buildings with an area of 24050 meters. This company is the project's facility (mechanical and electrical) contractor.
Mechanical, air conditioning and electrical operations of the project including the preparation and installation of the following devices:
- Two compression chillers with a capacity of 140 tons, three hot water boilers, three boilers, and twenty-seven air conditioners with different capacities and other engine room equipment.
- Twenty electropumps with different capacities, two cooling towers with a capacity of 140 tons
- Installation of fire extinguishing system and sewage treatment plant
- Electric substation and passage substation, which includes the supply and installation of high pressure and low pressure panels, capacitor bank panels, and the supply and installation of two transformers with a capacity of 1250 kilovolts.
- Supplying and installing two diesel generators with a power of 450 kW
- Preparation and installation of fire alarm system, audio system
- Preparation and installation of isolated panels and operating room clock system
Carrying out electrical steel piping, cable laying and wiring inside steel pipes