- Installation of three gas turbo compressors and all accessories including Drain-Vent and other package equipment
- Installation of process equipment, emergency gas generator (EGE), compressed air system and air compressors
- Piping of all industrial parts (process)
- Installation of weak and strong pressure panels, electrical equipment, electrical and control cabling, precision instrument cable piping, precision instrument cabling
- Welding and implementation of 1 process and utility piping and its painting
- Installation of gas pressure boosting station
- Excavation operations, molding and reinforcement, concreting of foundations supporting pipes and precision and electric tools.
- Preliminary testing and commissioning of the site and commissioning of all equipment and machines