The purpose of the implementation of the project is to build storage tanks to store process fluids and water in Dana Petrochemical and includes:
- Construction of concrete and earth foundations for the implementation of geomembrane insulation in the bottom of tanks
- Construction, installation and welding of carbon steel and stainless steel tanks in the amount of about 1300 tons
- Performing N.D.T and radiography operations according to the latest edition of API650 standard and project standards.
- Performing hydrostatic test operations.
- Sandblasting and painting of all tanks and acid washing of stainless steel tanks