Oil & Gas Projects

oil
Farashband gas pressure boosting station

Farashband gas pressure boosting station

Development Percentage
0

%

Farashband gas pressure boosting station
Client
National Gas Company of Iran
Consultant
OIEC
Status
Completed
Contract Period
9 Months
Commencement Date
April .2003

Installation of five gas turbo compressors and all accessories, including Oil System Drain-Vent and other package equipment:
- Installation of process equipment, emergency gas generator (EGE), compressed air system and air compressors, drying systems and emergency gas generators
- Installation of liquid gas containers, gas air coolers, oil pumps and oil coolers
- Installation of all faucets, pipes and their accessories, as well as connecting them to the existing and working pipeline system and the existing ball sending and receiving system.
- Installation of weak and strong pressure panels, PMS system, electrical equipment, generator, electrical and control cabling, precision instrument cable piping, precision instrument cabling
- Fire alarm, telecommunications, telephone and paging systems
- Excavation operations, molding and reinforcement, concreting of supports and execution of electric trenches and precision tools